P: 408.915.PFAB   650.364.3696    |    F: 408.703.4225   |   1240 Memorex Drive, Santa Clara, CA 95050

Electrical Prefab vs. Traditional Installation

Prefab vs. Traditional Side by Side Video

Watch the LIVE Action Side-by-Side Video Comparison as Prefab Beats ‘Traditional Install’!

 

By the end of this video you’ll be able to answer…

Delucchi Electric Prefabricated Assemblies save:

A.      22% of the installation time

B.      34% of the installation time

C.      47% of the installation time

D.      59% of the installation time

 

 

 

 

The Numbers:

Traditional Installation
(1 Office, 6 Assemblies)

Rough-in Time = 1 h 17 min
Trim Out Time = 41 min
 
Total Installation = 1 h 47 min

Prefab Installation
(1 Office, 6 Assemblies)

Rough-in Time = 30 min
Trim Out Time = 8 min
 
Total Installation = 49 min